We filed the permits and called for the mark-out before any digging. All the utilities run together in the front yard, so that step came first.
The excavation was no smaller than 10 feet across and roughly 4 to 5 feet deep, done with a machine and by hand. The meter inside the house is 3/4 copper, but the point where the line enters the house can’t be seen. The pipe size wasn’t known until we had dug down to it.
With the leak located, we made the repair using underground service fittings and pipe. Then we turned the water back on, bedded the area with sand, and backfilled the hole.